The influence of motivation factors on project performance in construction projects in Yemen
DOI:
https://doi.org/10.58963/qausrj.v1i25.102Keywords:
Motivation factors , Human factors , Construction Projects , Project performance , RII , YemenAbstract
Human factors seem to be not highly respected in construction projects in Yemen. Construction project managers and contractors focus on the technical skills of project key individuals. However, less attention is paid to their capabilities of managing project people. This study is to identify motivation factors that most significantly influence construction project performance. The data were collected through a questionnaire from 91 construction project team members representing 18 project teams executed by 18 first-class construction companies in Yemen. The relative importance index (RII) was determined the most significant motivation factors.
In addition, multiple regression analysis used to find the influence of motivation factors. The top motivational factors ranked by companies’ managements were; (1) relationship with colleagues, (2) advancement, (3) work itself, and (4) achievement. Among the 10 motivational factors investigated, only three motivational factors- achievement, appreciation and relationship with colleagues significantly influence the time performance of construction projects.
The findings imply that the time performance of construction projects will be improved if motivation factors are properly applied in construction project environment. The study recommended proper handling of motivation factors which are a part of human factors for achieving improved project time performance.
Metrics
Downloads
References
⬧ Aiyetan, A. O., & Olotuah, A. O. (2006). Impact of motivation on workers’ productivity in the Nigerian construction industry. In D. Boyd (Ed.), Procs 22nd Annual ARCOM Conference, 4-6 September 2006 ) , Birmingham, UK, Association of Researchers in Construction M , (pp. 239-248).
⬧ Alaghbari, W., Al-Sakkaf, A., & Sultan, B., (2018). Factors affecting construction labour productivity in Yemen, International Journal of Construction Management, 19(1): 79-91. doi: 10.1080/15623599.2017.1382091.
⬧ Alaghbari, W., Saadan, R.S., Alaswadi, W. and Sultan, B. (2018). “Delay Factors Impacting Construction Projects in Sana’a - Yemen”, PM World Journal, (Dec. 2018).
⬧ Alaghbari, W., & Sultan, B. (2015). The most significant factors influencing productivity during execution of construction projects in Yemen. Engineering Sciences Journal, 1(4), 41-57.
⬧ Al Seraji, A. (2010). Construction management in yemen: Evaluation and improve efficiency. Master Thesis. Faculty of Engineering, Sana’a: Sana’a University.
⬧ Ankrah, N. A. (2007). Factors influencing the culture of constrution project organization. PhD Thesis. University of Wolverhampton, Wolverhampton.
⬧ Ashraf, H., & Rowlinson, S. (2015). Conflict management climate in contractor’s project team: Conceptualizing its relatinship with interface management and project management. Engineering Project Organization Conference. The University of Edinburgh, Scotland, UK June 24-26,2015.
⬧ Azmy, N. (2012). The role of team effectiveness in construction project teams and project performance. PhD Thesis. Construction Engineering & Management, Iowa State University, Ann Arbor, Iowa, USA.
⬧ Cheng, E. W., Ryan, N., & Kelly, S. (2012). Exploring the perceived influence of safety management practices on project performance in the construction industry. Safety Science, 50(2), 363-369.
⬧ Dwivedula, R. and Bredillet, C. (2009). The relation between work motiva-tion and project management success : an empirical investigation. In International Research Network for Organizing by Projects-IRNOP 9, Berlin. http://eprints.qut.edu.au/49, 1-33.
⬧ Gamil, Y. & Rahman, I. A. (2020). Assessment of critical factors contributing to construction failure in Yemen, International Journal of Construction Management, 20(5): 429-436, DOI: 10.1080/15623599.2018.1484866
⬧ Gido, J., & Clement, J. P. (2011). Successful project management (5 ed.).Cengage Learning. New York.
⬧ Hackman, J. E., & Oldham, F. R. (1980). Work redesign. Reading, Mass:Addison-Wesley.
⬧ Jarkas, A. M., Al Balushi, R. A., & Raveendranath, P. (2015). Determinants of construction labour productivity in Oman. International Journal of Construction Management,, 15(4), 332-344. doi:10.1080/15623599.2015.1094849
⬧ Kassem, M., Khoiry, M.A. and Hamzah, N. (2020). «Assessment of the effect of external risk factors on the success of an oil and gas construction project», Engineering, Construction and Architectural Management, 27( 9),2767-2793. https://doi.org/10.1108/ECAM-10-2019-0573
⬧ Kazaz, A., Manisali, E., & Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal of Civil Engineering & Management, 14(2), pp. 95-106.
⬧ Kibuchi, P. (2012). The contribution of human factors in the performance of construction projects in Kenya: a case study of construction project team participants in Nairobi. PhD. University of Nayrobi.
⬧ Lawal, ,. A., & Okhankhuele, O. T. (2014). The effet of motivation on project execution in Nigeria: A case study of Bayelsa plastic industry. British Journal of Applied Sciences & Technology, 4, pp. 2985-3002.
⬧ Maritz, M. J., & Ogwueleka, A. C. (2013). Construction employees’ perspective on workforce motivational drivers in Akwa Ibom State of Nigeria. Journal of Construction 5(2), 2-6.
⬧ Monese, L. N., & Thawal, W. D. (2008). Motivation of construction workers in South Africa sites. CIBD PAPER 24.
⬧ Mullins, L. J. (2007). Management and organizational behaviour. Pretice Hall.
⬧ Najib, A. F., Soon, N. K., Zainal, R., Ahmad, A. R., & Hasaballah, A. H. A.(2018). Influential factors in construction industry of Yemen. In Proceedings of the 21st international symposium on advancement of construction management and real estate, pp. 927-943. Singapore: Springer.
⬧ Omran, A., Abdalrahman, S., & Pakir, A. H. (2012). Project performance in Sudan construction industry: A case study. Academic Research Journal (India), 1(1), 55-78.
⬧ Orando, M. (2013). The influence of human behavior factors on construction productivity. PhD Thesis. University of Free State. Bloemfontein.
⬧ Parkin, A. B., Tutesigensi, A., & Buyualp, A. I. (2009). Motivation among construction workers in Turkey. Proceedings, 25th Annual ARCOM conference, Nottingham, UK: Associatio of Researchers in Construction Management, pp. 105-114.
⬧ Sekhar, C., Patwardhan, M., & Singh, R. R. (2013). A literature review on motivation. International Network of Business and Management, 471-487.
⬧ Sultan, B. and Alaghbari, W. (2018). “Political Instability and the Informal Construction Sector in Yemen”, International Journal of Civil Engineering and Technology (IJCIET)- Scopus Indexed, 9 (11): pp. 1228-1235 (Nov.2018).
⬧ http://www.iaeme.com/MasterAdmin/Journal_uploads/IJCIET/VOLUME_9_ISSUE_11/IJCIET_09_11_119.pdf
⬧ Sultan, B., and Alaghbari. W., (2017). Priorities for sustainable construction industry development in Yemen, International Journal of Applied Engineering Research, 12(6): 886-893. https://www.ripublication.com/ijaer17/ijaerv12n6_13.pdf
⬧ Sultan, B. and Alaghbari, W. (2020). “Investigating the Cost of Modern Construction in Yemen”. International Journal of Civil Engineering and Technology, 11 (3): pp. 97-104. (March 2020).
⬧ http://iaeme.com/MasterAdmin/Journal_uploads/IJCIET/VOLUME_11_ISSUE_3/IJCIET_11_03_010.pdf
⬧ Tatar, H., Altinoz, M., & Cakiroglu, D. (2011). The effects of employee empowerment on achievement motivation and the contextual performance of employees. African Journal of Business Management, 15(5), 6318-6329 http://www.academicjournals.org/AJBM ISSN 1993-8233 @2011 Academic Journals.
⬧ Tech-Hong, T., & Waheed, A. (2011). Herzberg’s motivation-hygiene theory and job satisfaction in the Malaysian retail sector: The mediating effect of love of money. Asian Academy of Management Journal, 16(1), 73-94.
⬧ Venkatesan, R., Varghese, K., & Ananthanarayanan, R. (2009). Motivatin among construction operative motivation on selected sites in Nigeria.
⬧ Verma, V. K. (1996). The human aspects of project management: Human resource skills for the project manager. (2 ed., Vol.2).USA: PMI.
⬧ Verma, V. K. (1998). Conflict Managment. Project management handbook. Ed Jeffery pinto.
⬧Yisa, S. B., Holt, G. D., & Zakeri, M. ((2000)). Factors affecting management motivation in the Iranian construction industry: a survey of site managers. In A. Akintoye (Ed.), 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow Caledonian University. Asso, 2, pp. 465-472.
⬧Yusoff, W. F., Kian, T. S., & Idris, M. T. (2013). Herzberg’s two factor theory on work motivation: Does it work for today’s environment? Global Journal of Commerce and Management Perspective, 2(5), 18-22.
⬧Zakeri, M., Olomolaiye, P., Holt, G., & Harris, F. C. (1997). Factors affecting the motivation of Ianian construction operatives. Building and Environment, 32(2),161-166.
Downloads
Published
Issue
Section
Categories
License
Copyright (c) 2020 Queen Arwa University Journal
This work is licensed under a Creative Commons Attribution 4.0 International License.